  • Construction Services Division, 2019-2020

    Resident Engineer, Asphalt Overlay project, consultant to the County of San Diego.

  • State of California DGS, 2017-2019
    Senior Construction Management Consulting for new $40 M Cal Fire So Ops campus with 9 buildings on 12 acres in Moreno Valley, CA .  

  • Construction Management | 2014-2016
    Performed Construction Management and Inspection of projects and construction for CIP Program in the Water Utilities Department.  In 2015/16, PdM Consulting, Inc. successfully managed over $4 Million in design and construction projects, seeing each one completed on time and within budget  

  • Erosion and Sediment Control | 2015-2016 | Lake Forest, CA
    Design of temporary and permanent Erosion and Sediment Control measures in open, stream bed areas of Lake Forest's Canada and Overlake drains.

  • Port Expansion Project-Oean Boulevard Track Realignment and Pier F Support Yard, 2012-2014
    Office Engineer for Construction Management Team on a $7.9 M contract Port capacity expansion project.

  • Mare Island, Vallejo, CA | 2006-2009
    Mr. de Monchy was the Engineer of Record, Project Manager, Program Manager, and Owner’s Representative for a $2 Billion, 190-acre University and Health Sciences Research Campus development in the San Francisco Bay area.  

Commerical / Industrial Projects

  • Tehachappi Pass Tower and Power Line Access Roads/SCE, Los Angeles, CA  2007-2008  Engineer of Record for plan preparation and processing of large plan set showing Grading and Drainage design for Access Roads to the existing and proposed towers and power lines in Segment 2 of the Southern California Edison Tehachappi Pass project.  

  • Mr. de Monchy was the Engineer of Record and Program Manager for three Flyover Bridges and 1.5 miles of secondary major highway improvements with all required utilities and state-of-the-art CMS (Changeable Message Signs) for Disney California Adventure Theme Park.  Project costs totaled over $1B.  

  • Program Manager and Owner Representative for a 64-acre master planned Industrial/Business Park in East Banning, California and adjacent to the Banning Airport and existing freight trail.

  • Mr. de Monchy was the Engineer of Record and Project Manager for new 500,000 S.F. warehouse and distribution center for national grocery distribution chain trucking company, McLane Foods. Facility was designed and constructed on a portion of the land formerly known as March Air Force Base in southeast Riverside County.

  • Engineer of Record, Project Manager, and Owner’s Rep for 160-acre Industrial Park in the Southern California Coachella Valley.  Improvements designed included a $19 Million lined storm drain channel including inlet and outlet works, and 2,600 lf of trunk water and sewer lines-all for the Coachella Valley Water District, CVWD.  